Another letter from concerned citizen regarding the Parachute Gas Plant toxic waste spill

From: Matt Lepore - DNR <matt.lepore@state.co.us> 
Date: 
To: Jodee Brekke <Jodee.Brekke@cort.com> 
Subject: RE: Emailing: 536433_497576430298431_203489034_n.jpg 


Ms. Brekke:

No regulatory regime can prevent every spill; no regulatory agency can be on-site 24 hours, 7 days a week, 365 days a year to monitor an operator’s every action.  It appears Williams reported the impacts to soil and, subsequently, groundwater, to COGCC as soon as they learned of those impacts.  The Spill Report attached to your email was submitted to COGCC by Williams as required by our Rules.  That is evidence of a regulatory system working.  COGCC staff, including our Environmental Manager, our Rifle Office Manager, and several Environmental Protection Specialists, have been on site nearly every working day since the groundwater impacts were reported to us.  The companies involved have been taking action to respond to the contamination since it was discovered.  We have issued a Cease and Desist Order and Notices of Alleged Violations to the Parties, and are actively monitoring and overseeing the on-going response actions.  The responsible party or parties will be obligated to remediate the environmental impacts.  Fines and other remedies will be considered by the Commission at the appropriate time, consistent with the Commission’s statutory authority and our Rules. 

Sincerely,

Matt

Matthew Lepore
Director
Colorado Oil and Gas Conservation Commission

From: Jodee Brekke [mailto:Jodee.Brekke@cort.com]
Sent: Tuesday, March 26, 2013 4:39 PM
To: Matt.Lepore@state.co.us
Subject: Emailing: 536433_497576430298431_203489034_n.jpg

Mr. Lepore,
In regard to the accident in Parachute CO (attached), the COGCC has once again failed to prevent adverse impacts and the industry operator should be held accountable for all reclamation costs, fines and punitive damages.

Jodee Brekke

Saturday, September 15, 2012

KERR-MCGEE OIL & GAS - INCIDENT CAUSED GROUNDWATER CONTAMINATION - BENZENE



WHILE HYDRO-VACING TO LOCATE UNTRACEABLE UNDERGROUND LINES, PETROLEUM HYDROCARBON-IMPACTED SOIL WAS DISCOVERED. A HOLE IN THE WATER DUMP LINE WAS DISCOVERED WHILE EXCAVATING THE IMPACTED SOIL. THE VOLUME OF THE RELEASE IS UNKNOWN.

Click image and docx to enlarge







Monday, May 28, 2012

NOBLE ENERGY O&G: Groundwater Impacted – Spill/Incident Report



Date received: 5/14/2012

WELD COUNTY, COLORADO

Operator:NOBLE ENERGY PRODUCTION INCOper. No.10120
Address:1625 BROADWAY STE 2200 ATTN: TED BROWN  DENVER , CO 80202
Phone:(303 )389-3600Fax:(303 )595-7403
Operator Contact:RYAN  BRUNER

Current land use: PASTURE
Groundwater impacted: YES
Cause of spill: EQUIPMENT FAILURE
LINK


click images to enlarge




NOBLE ENERGY O&G: Groundwater Impacted – Spill/Incident Report



Date Received: 2/17/2012

WELD COUNTY, COLORADO

Operator:NOBLE ENERGY INCOper. No.100322
Address:1625 BROADWAY STE 2200 ATTN: LINDA PAVELKA  DENVER , CO 80202
Phone:(303 )228-4000Fax:(303 )349-5180
Operator Contact:RYAN  BRUNER


Current land use:  AGRICULTURE
Groundwater impacted: YES
Cause of spill: Equipment Failure
LINK



click image to enlarge









KERR-MCGEE O&G: Groundwater Impacted – Spill/Incident Report



Date received 5/18/2012

WELD COUNTY, COLORADO

Operator: KERR-MCGEE OIL & GAS ONSHORE LP Oper. No. 47120 Address: P O BOX 173779 ATTN: ASHLEY COCCIOLONE DENVER , CO 80217-3779 Phone: (720 )929-6000 Fax: (720 )929-7461 Operator Contact: PAUL SCHNEIDER

Current land use: AGRICULTURE
Ground water impacted: YES
Cause of spill: Equipment Failure
LINK

click image to enlarge












Immediate Response:
THE WELL WAS SHUT IN AND THE WATER TANK WAS EMPTIED. THE PETROLEUM HYDROCARBON-IMPACTED SOIL IS BEING EXCAVATED. GROUNDWATER WAS ENCOUNTERED IN THE EXCAVATION AT ~8` BGS. BENZENE IMPACTS (630 UG/L) TO GROUNDWATER ABOVE THE CGWQS WERE CONFIRMED BY THE LAB ANALYTICAL REPORT.

Emergency Pits:
NA

How extent determined:
SOIL AND GROUNDWATER SAMPLES WILL BE COLLECTED AND THE ANALYTICAL RESULS AND EXCAVATION DETAILS WILL BE PROVIDED ON A FORM 27.

Further Remediation
WILL BE PROVIDED ON A FORM 27.
Prevent Problem:

THE FITTING ON THE WATER TANK WILL BE REPAIRED.
Detailed Description:

DURING TANK BATTERY CONSTRUCTION, FIELD CREWS ENCOUNTERED PETROLEUM HYDROCARBON-IMPACTED SOIL UNDER THE WATER TANK. A LOOSE FITTING ON THE SIDE OF THE WATER TANK WAS IDENTIFIED AS THE SOURCE OF THE RELEASE. THE VOLUME OF THE RELEASE IS UNKNOWN.